Downloads

Title Download
Procedure of RERC (Green Energy Open Access) Regulations 2025
STOMS METER INTEGRATION PROCEDURE
Procedure of RERC (T&C for Open Access), Regulations, 2016
Curtailment_RE_Power_Jan. 2026
Curtailment_RE_Power_Dec.2025.pdf
SOP FOR RE CONNECTIVITY TO RVPN NETWORK
Curtailment_RE_Power_Nov. 2025
Final Transmission Losses for the FY 2020-21
Final Transmission Losses for the FY 2021-22
Final Transmission Losses for the FY 2022-23
Final Transmission Losses for the FY 2023-24
Final Transmission losses for the FY 2024-25
Amendment of Procedure of RERC(Forecasting, Scheduling, Deviation of wind &Solar) Regulations, 2017
Procedure of RERC(Forecasting, Scheduling, Deviation of wind &Solar) Regulations, 2017 P
Procedure of RERC (T&C for Open Access), Regulations, 2016
STOMS METER INTEGRATION PROCEDURE
Revised STOMS Integration Charges
217th OCC Approved and Rejected shutdowns for April-2024
Integration Of New ABT Meter To STOMS Centre
204th OCC Approved & Rejected shutdown for March-2023
203rd OCC Approved and Rejected shutdown for Feb-2023
202nd OCC Approved & Rejected shutdown for JAN-2023
201st OCC Approved & Rejected shutdowns for December-2022
Procedure of STOA Registration and processing of application in Eltrix
200th OCC Approved shutdowns for November - 2022
199th OCC Approved Shutdowns
Implementation of E-Receipt Application
198th OCC Approved shutdowns for September - 2022
197 OCC approved and Rejected shutdowns for Aug-2022
196 OCC Approved and Rejeted shutdowns
195 OCC Approved and Rejected shutdown for June-2022
194 OCC Approved and Rejected Shutdowns of May-2022
193 OCC Approved Shutdown for April-2022.xlsx
192 OCC SD approved for March-2022
191st OCC Approved & Rejected shutdown for FEB-2022
190th OCC Approved and Rejected shutdown for JAN-2022
189th OCC Approved and Rejected shutdowns fo the month of Dec-2021
188th OCC Approved and Rejected shutdowns for November-2021
187th OCC Approved & Rejected Shutdowns for October-2021
CODE OF PRACTICE METERING
186th OCC Approved & Rejected Shutdowns for Aug-2021
185th OCC Approved Shutdowns for Aug-2021
Procedure for scheduling,Despatch and DSM in line with RERC DSM Regulations 2017
2nd Amendment in procedure for RERC F&S Regulations 2017 (as on 23.06.2021)
Detailed Procedure for RERC RE F&S DSM Regulations 2017 (Ist Ammendment as on 23.10.2019)
Detailed Procedure for RERC RE F&S DSM Regulations 2017 (Principal)
TTC/ATC of Rajasthan
DSM Formula Reference from 22-April-2019
DSM Formula Reference till 21-April-2019
Guidelines for integration of ABT meters for EHV costumers with STOMS
Account Details of Sr. A.O. (LD)
CERC Procedure for Inter State Open Access- Bilateral Transactions
CERC Procedure for Inter State Open Access- Collective Transactions
CERC Open Access Regulations 2008
Uploaded SLDC- charges bills in Rajasthan SLDC website
Transmission Losses of Rajasthan from 2016-17 to 2019-20 as per the drawl of energy through the tie lines
Transmission Losses of Rajasthan from 2004-05 to 2015-16 as per the booking from the central generating stations
Revised Guidelines for Integration of new ABT Meters
QCA Wise Installed Capacity
Installation Of Check Meter
Necessary modifications in the present system to provide relevant data
EOI Notification
MOM Dated 10.02.2020
Bank Guarantee Format
ABT Meters Certificate Format
MTOA User Manual for Applicant
LTOA User Manual for Applicant
Procedure for LTOA,MTOA & STOA
Guidelines for telemetry data
Current OA consumers
RERC Open Access Regulation 2016